Welcome to the BMS A/S Cases page, here you can find examples of projects where we describe the task, the process, and the solution. The page provides an overview of our work and results.

Filter search by
  • All
Case

Harbour Crane Renovation at the Port of Aarhus

BMS used three large cranes to lift and reassemble a 460-ton crane after slewing ring replacement in a saltwater-exposed environment.
Case

Transport of 40 XXL monopiles

BMS handled the internal transport and load out of 40 XXL monopiles up to 100 metres long and more than 1,200 tonnes for Ørsted’s Borkum Riffgrund 3 offshore wind farm. Using a large fleet of SPMTs, we moved both production sections and completed monopiles before they continued towards final installation.
Case

Safe Renovation in a Nature-Protected Area

BMS Kolding assisted in lifting Gelsbro for renovation and returning it safely using Liebherr LTM1250 and LTM1500 cranes, all within the limited space of the nature-protected area.
Case

BMS secures the foundation for Denmark’s energy grid

The Danish electricity grid is facing major changes with more wind, solar and green energy. With over 100,000 steel plates and advanced equipment, BMS ensures an efficient and safe expansion of the grid from the west coast to the east.
Case

BMS invests in future solutions for the wind industry

Case

Strong collaboration raises footbridge at Kastrup Airport

BMS A/S, BMS Heavy Cranes and Torben Rafn, together with the other project participants, have completed a major lifting project in connection with the expansion of Copenhagen Airport Station. The task was to hoist a new footbridge from Terminal 3 into place over the train platforms.
Case

Creative solutions for tight spaces

Two heavy glass panes had to be installed on narrow balconies without crane access in front of the building. With a mobile tower crane and balance beam, the panes were safely lifted and positioned. A creative solution where precision and planning made all the difference.
Case

169 Tons of Cultural Heritage in the Air: BMS Lifts Historic Dock Gate in Copenhagen

A historic dock gate from the 1850s has been lifted from its position by the Opera House in Copenhagen. In a coordinated effort involving a floating crane and three mobile cranes from BMS and our sister company Skaks, the gate was rotated and placed into a coaster. It is now en route to Grenaa for restoration before returning home in December.
Case

Rapid response to traffic accident

A sudden accident on the road required immediate action. Our crane driver Danni cleared the traffic in just 30 minutes and helped everyone move on safely.
Case

TWO PRESSURE CHAMBERS FOR THE NATIONAL HOSPITAL

RIGSHOSPITALET, THE NATIONAL HOSPITAL IN DENMARK, IS A HIGHLY SPECIALISED FACILITY THAT OFFERS INTERNATIONAL-LEVEL TREATMENT, RESEARCH, INNOVATION, AND TRAINING IN MOST MEDICAL SPECIALIST AREAS
Case

BMS delivers crane and rigging services in Fredericia

During Crossbridge Energy’s scheduled refinery shutdown in Fredericia, BMS A/S delivered a fully integrated lifting solution under demanding conditions, characterised by 24/7 operations, strict safety protocols, and time-critical coordination. 
Case

Carbon Capture – Just Catch 100, Asnæs Power Station & Avedøre Power Station

Carbon Capture – Just Catch 100, Asnæs Power Station & Avedøre Power Station
Case

Bodil was hoisted aboard the ship Wind Discovery

The installation vessel Wind Discovery has been provided with additional lifting capacity at Esbjerg Harbour, with the mobile crane Bodil lifted on board to support the work.
Case

BMS Esbjerg is providing assistance on WIND PEAK

Assistance was provided with cranes and lifts at Esbjerg Harbour for the transport and installation of large turbines on the offshore vessel WIND PEAK.
Case

Old, protected bridge lifted in Tønder

A 35-ton, protected bridge in Tønder has been carefully lifted and transported to Hjordkær with a powerful LTM 1750-9.1 mobile crane for an extensive renovation.
Case

Hoisting of evaporator in freezer room at -20°C

Hoisting of 1-ton evaporator in freezer room at -20°C, efficiently solved with Hoeflon C6 mini crane in confined and demanding conditions.
Case

Hoisting and Replacement of Switchgear in Central Copenhagen

Efficient lifting of a 500 kg switchgear over a 22-meter high building in Copenhagen with a 200tm truck crane and fly-jib.
Case

Transport and lifting job in Kalundborg

Efficient transport and lifting of an 11m, 8-ton refrigeration unit in Kalundborg with a 165 tm truck crane and extendable trailer.
Case

Efficient and precise lifting of transformers for Aalborg Forsyning A/S

BMS lifted two 146.3 ton transformers for Aalborg Forsyning A/S with precision, safety, and sustainability in focus.
Case

BMS provided a complete solution for the mast hoisting

BMS provided a complete solution for the mast hoisting