Menu ikon

Contact local department

phone

Cases

On this page, you will find selected BMS cases showcasing real projects involving cranes, heavy lifting, transport, truck-mounted lifts and steel plates.

The cases provide insight into planning, execution and the solutions used to ensure safe and efficient handling of complex operations.

Our services in practice

See how we work with mobile cranes, truck-mounted cranes and heavy transport in real projects.

Filter search by
  • All
Luftfoto af mobilkranens bom, der rækker hen over Magasins bygning i Odense.
Case

Tower crane in an Odense courtyard: a matter of centimetres

A 32-metre tower crane had to be erected in a confined courtyard in central Odense. The solution required careful coordination of crane selection, reach, ground conditions and just a few centimetres of clearance.
Kollage af BMS minikran i indendørs løftearbejde: opstilling i dørparti, løft af stor emballeret genstand, og detalje af rigning under lavt loft
Case

When access conditions require a mini crawler crane

Limited access, confined spaces and indoor lifting. This was a job where a mini crawler crane provided the right solution.
Minikran transporteres gennem en smal port til baggård i Aarhus.
Case

Mini crawler crane through a narrow gateway into a courtyard in Aarhus

BMS lastbilkran løfter container ved havnen i Aalborg
Case

Containers in the air at the Tall Ships Race in Aalborg

Mobilkranen Birdie ved vandtårn i Nykøbing Falster
Case

Birdie at the water tower

The mobile crane Birdie helped secure the water tower in Hollands Gård in Nykøbing Falster, where loose roof tiles had to be handled before Madens Folkemøde.
Levring af overskudstræ til teknisk skole
Case

8 tonnes of timber sent on to EUC Køge

Approximately 8 tonnes of timber from Novo Nordisk in Køge has been donated to EUC Køge, where the materials can be used in training.
Tagkonstruktion svæver i luften, hejst af BMS kran
Case

Roof structures lifted off and reused in Hirtshals

Existing roof structures are lifted off, stored and later reused as part of a major renovation in Hirtshals, where planning, reuse and safe lifting go hand in hand.
Samløft af 140 meter rør på Kolding Havn med mobilkraner og lastbilkraner
Case

Multi-crane lift installs 140-metre pipe at the Port of Kolding

A 140-metre, 86-ton pipe was lifted into place at the Port of Kolding in a multi-crane lift using four mobile cranes and two truck-mounted cranes.
Mobilkraner ved opførelse af nyt stadion i Aarhus
Case

New stadium in Aarhus

The construction of the new stadium in Aarhus is a project at the heavy end. Not only in kilos and tons, but in coordination, sequences and cooperation. Here, several cranes have worked simultaneously in a construction process where timing and planning have been crucial.
Case

Roofboxes for New OUH

On the construction of Nyt OUH in Odense, installing large roofboxes above the elevator shafts has been a special task for almost a year and a half.
Kulbroen i Aarhus. Specialtransport
Case

The coal bridge in Aarhus

A 57-ton bridge section had to be transported through the city and lifted into place between the buildings in the Spain area of Aarhus. The task required precise planning, close collaboration and the right equipment.
Case

Installation through the facade

Installation of specially designed steel stairs in office buildings with limited access and assembly on multiple levels.
Case

Driving plates for T-Hansen fireworks stands

BMS has handled both road plates and containers for several years in connection with the fireworks season at T-Hansen. The video shows our driver Søren laying out road plates so that the stalls can be set up safely and efficiently and there are good access routes. The task requires both logistics and speed, and solutions that work in practice.
Case

When heavy lifting starts on the drawing board

Skybridges at Nyt OUH in Odense weigh up to 158 tons and therefore the lift starts long before the crane moves in. Thorough planning, lifting plans, crane selection and engineer-calculated, CE-approved special equipment are essential for a safe lift. The lift was planned by BMS Project & Engineering and carried out in collaboration with BMS Heavy Cranes. A close collaboration that ensures quality and efficiency all the way.